• Home
  • News
  • Static and dynamic testing of the viaduct

Static and dynamic testing of the viaduct

 

Warning: mysql_get_server_info(): Access denied for user ''@'localhost' (using password: NO) in /home/kuzmsimunhr/public_html/wp-content/plugins/xml-google-maps/xmlgooglemaps_dbfunctions.php on line 10

Warning: mysql_get_server_info(): A link to the server could not be established in /home/kuzmsimunhr/public_html/wp-content/plugins/xml-google-maps/xmlgooglemaps_dbfunctions.php on line 10

Our special team is working on static and dynamic testing of the viaduct on the new section of Croatian Highway A1 from Ravca to Ploce.

Testing is performed on two viaducts:

The viaduct “Mali Prolog“, which consists of 2 viaducts, formed of prestressed longitudinal beams. In the longitudinal disposition is 16 ranges in total length 475 m, while the transverse disposition width is 12,7 m to 14,2 m.

The viaduct “Iskisli“, which consists of 2 viaducts, formed of prestressed longitudinal beams. In the longitudinal disposition is 5 ranges in total length 108 m, while the transverse disposition width is 14,0 m.

 

 
© 2011 KUZMANIĆ&ŠIMUNOVIĆ PROJEKT d.o.o.
Your Specialist in BUILDING STRUCTURES | Split | Croatia | Europe