• Home
  • References
  • Reconstruction of hydropower plant “MHE Cabranka”, Cabar

Reconstruction of hydropower plant “MHE Cabranka”, Cabar

 

Warning: mysql_get_server_info(): Access denied for user ''@'localhost' (using password: NO) in /home/kuzmsimunhr/public_html/wp-content/plugins/xml-google-maps/xmlgooglemaps_dbfunctions.php on line 10

Warning: mysql_get_server_info(): A link to the server could not be established in /home/kuzmsimunhr/public_html/wp-content/plugins/xml-google-maps/xmlgooglemaps_dbfunctions.php on line 10

Replacement of equipment and modernization of small hydropower “MHE Cabranka” in Cabar, Croatia.

Main designer: Tomislav Miljak, dipl.ing.el. (Prointegris d.o.o.)

Architectural and engineering design: David Kuzmanić, mag.ing.aedif. (Kuzmanic&Simunovic projekt d.o.o.)

 
© 2011 KUZMANIĆ&ŠIMUNOVIĆ PROJEKT d.o.o.
Your Specialist in BUILDING STRUCTURES | Split | Croatia | Europe