EUROTIM manufacturing hall

 

Warning: mysql_get_server_info(): Access denied for user ''@'localhost' (using password: NO) in /home/kuzmsimunhr/public_html/wp-content/plugins/xml-google-maps/xmlgooglemaps_dbfunctions.php on line 10

Warning: mysql_get_server_info(): A link to the server could not be established in /home/kuzmsimunhr/public_html/wp-content/plugins/xml-google-maps/xmlgooglemaps_dbfunctions.php on line 10

In September K&Spro design team started working on structural design of production hall in Sinj. The subject is the reconstruction and upgrading of the western part the existing hall in Sinj. Plan dimensions are approximately 7 m x 47 m and 7.7 m in height.
Considering the architectural requests the new structure contains a concrete slab on existing walls and lightweight steel construction as superstructure. The main construction of the superstructure is composed of 14 single-boxed frames at the axial distance ranging from 2.80 m to 4.07 m. K&Spro design team made 3D workshop blueprints of steel construction.
Investment is worth around 200 000 €.

Roles:

K&Spro design team   

– construction engineering

– building physics design

– water supply and sewerage system engineering

 

 
© 2011 KUZMANIĆ&ŠIMUNOVIĆ PROJEKT d.o.o.
Your Specialist in BUILDING STRUCTURES | Split | Croatia | Europe